Antwort: Re: checks, notifications don't work after time period exception

Thomas Borger Thomas.Borger at esg.de
Thu Aug 28 07:10:36 CEST 2008


Hi,

I have exact the same experiences with timeperiod exclusion. It does not
work in the moment or we have had not understand the corresponding part
in the nagios documentation?! ;-)

> I had defined a timeperiod of "ProdSLA" which was 24x7, then an
> exclusion timeperiod called "ProdMaint", which was 0300-0500 daily,
> then added that as an excluded time period for ProdSLA.  This was used
> for checks, not notifications.  As the start of the excluded time
> period would be reached, it'd stop checking, as designed, but never
> resuming checking at 0500.  I'll have to see if I can dig out the
> config files from CVS.  It was a 3.x install.


-------------------------------------------------------------------------
This SF.Net email is sponsored by the Moblin Your Move Developer's challenge
Build the coolest Linux based applications with Moblin SDK & win great prizes
Grand prize is a trip for two to an Open Source event anywhere in the world
http://moblin-contest.org/redirect.php?banner_id=100&url=/
_______________________________________________
Nagios-users mailing list
Nagios-users at lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/nagios-users
::: Please include Nagios version, plugin version (-v) and OS when reporting any issue. 
::: Messages without supporting info will risk being sent to /dev/null





More information about the Users mailing list