Periodic Overrides

Ton Voon ton.voon at opsera.com
Fri Mar 13 19:07:54 CET 2009


On 12 Mar 2009, at 15:29, Jason Frisvold wrote:

>
> 	For any given service, what is the accepted method for overriding  
> test
> values for a specific time period?  For example, we have servers that
> are backed up at a given time each night.  During the backup period,
> load is driven up on the server, exceeding the current threshold.   
> This,
> in turn, results in alerts being sent out about the server.
>
> 	However, since we know about this in advance, and it's a scheduled
> service, we'd like to override the load value during the backup  
> period.
> So if we normally trigger on a load of 2, we'd like to instead trigger
> on a load of 4 during backups.
>
> 	I know I can create two services with two timeperiods that will  
> handle
> this, but is there a better way?

Check out our patch: http://opsview-blog.opsera.com/dotorg/2007/04/changing_a_serv.html

You can then run a different command based on the timeperiod specified.

Ton


------------------------------------------------------------------------------
Apps built with the Adobe(R) Flex(R) framework and Flex Builder(TM) are
powering Web 2.0 with engaging, cross-platform capabilities. Quickly and
easily build your RIAs with Flex Builder, the Eclipse(TM)based development
software that enables intelligent coding and step-through debugging.
Download the free 60 day trial. http://p.sf.net/sfu/www-adobe-com
_______________________________________________
Nagios-users mailing list
Nagios-users at lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/nagios-users
::: Please include Nagios version, plugin version (-v) and OS when reporting any issue. 
::: Messages without supporting info will risk being sent to /dev/null





More information about the Users mailing list